Answer the assessment
Home type, timeline, style preference. Under 60 seconds, no commitment.
Six directions. Find the one that feels like you.
Find Your Style
Most contractors adjust the bill mid-project. Ours don't. 96% of our jobs close at the exact quoted price.
Every phase planned before work begins. Your timeline is a promise, not a guess.
"The quote was the invoice. No extras, no surprises."
— Sarah T., Etobicoke
A decade of local projects means no layout surprises us.
Before
After
Before
After
Before
After
Before
After
Before
After
This is a budgetary estimate based on typical GTA project costs. Your final quote will depend on site conditions, material selections, and confirmed scope.
Get a precise quote →1,400 bathrooms. Real homes across Toronto, Mississauga, Brampton, Hamilton, Barrie — and dozens of neighbourhoods in between.
Each pin is a home we changed.
Find yours.
Before the first call, most homeowners want to know the same things.
Cost, time, warranty, and fit. Here they are.
It depends on scope. A tub-to-shower conversion typically runs $12,000–$22,000. A full remodel ranges from $22,000 to $45,000 or more, depending on size, materials, and whether plumbing moves. Use the estimate tool above for a number based on your project.
Most shower and bath replacements are done in 1 to 2 days. Tub-to-shower conversions typically take 2 to 4 days. Full remodels run 10 to 18 business days depending on demolition, plumbing changes, and tile complexity.
Installation workmanship and core materials, for as long as you own the home. If something fails because of how it was installed, we fix it. Material defects from the manufacturer fall under the manufacturer's own warranty, which we help you navigate.
Yes. Barrier-free entries, built-in grab bars, fold-down seating, slip-resistant tile, and low-threshold showers can all be integrated from the start. The goal is a bathroom that works medically and still looks like a proper room.
No. Most projects are contained to a single bathroom, and the crew works clean — floor protection, dust barriers, and a same-day site cleanup each evening. If you have a second bathroom, you will not notice the work is happening.
A short assessment call to understand your bathroom and goals. A fixed-price proposal within 48 hours. A design review where you approve materials and layout. Then installation, typically in one to three days. Final walkthrough before we leave.